What we build
Five ways we work.
Every project is contracted, surveyed and built by our own site team. Grey structure or turnkey: the scope is agreed in writing before anything starts.
Pick the shape of the job.
The five contracts below cover everything we do. If your project sits across two of them, say so on the enquiry form and we will tell you which one it should be written as.
+176'
01
High-Rise Construction
Seven to sixteen storeys with up to two basement levels, shoring and dewatering.- 8 completed at 7 storeys or more
- Tallest: 176 ft, One World Tower
- 48,000 sq ft of owned formwork
+115'
02
Commercial Buildings
Plazas, showrooms, offices and banquet halls across Lahore’s commercial corridors.- 17 commercial buildings delivered
- MM Alam Road, Gulberg, Garden Town
- Trading-ready ground floors
+037'
03
Industrial Facilities
Wide-span sheds, factories, warehouses, utility blocks and office blocks.- 380,000 sq ft at Sunder Estate
- Machine foundations set by survey
- Phased handover for installation
+090'
04
Residential & Apartments
Houses and apartment buildings across DHA, Gulberg, Johar Town and Model Town.- 7 private residences built
- Apartment buildings to 8 storeys
- Grey structure, finishing or turnkey
+060'
05
Grey Structure & Turnkey
Take the frame and finish it yourself, or hand over the whole scope and take the keys.- Scope agreed in writing first
- Cube tests on structural pours
- Total-station set-out throughout
Seven stages, from your
drawings to your keys.
- 01
Drawings & scope
We take your consultant’s drawings, mark our RFIs, and agree the scope in writing before anything is priced.
- 02
Survey & set out
Total station on site. Levels, grid and boundaries confirmed against the approved plan before excavation.
- 03
Substructure
Excavation, shoring where the basement demands it, raft or footings, waterproofing. Up to two levels below grade.
- 04
Structure & frame
Column, slab and shear wall. Our own formwork, our own cycle. Cube tests on every pour.
- 05
Services & MEP
Conduiting, plumbing and shaft coordination sequenced into the frame, not chased into it afterwards.
- 06
Finishing
Where the contract is turnkey. Where it is grey structure, we hand over here.
- 07
Handover & defects
Snag list walked with you and your consultant. Defects period agreed in the contract, not left implied.